three winding transformer with following parameters,
- 132/11/11 kV (both the 11 kV windings are loaded).
- 120/60/60 MVA
- YN yn0 yn0
1- what is the recommended/practical Z% between HV-LV1 , HV-LV2 , and LV1-LV2 ? to limit the short circuit to 15 kA.
2- is there is a requirement for NER for...
Greetings,
for 33 kV OHL steel lattice tower, and for designing the structure, the working loads (for normal condition, and broken wire condition) shall be multiplied by a factor of safety (=2 for NC, and =1.5 for BWC).
now incase of BWC all loadings (for intact and broken wires) shall be...
for 33 kV double circuit OHL lattice steel towers, what is the criteria for selecting the back to back distance (distance between tower legs).
is it related to tower height, or tower slop ?.
any reference for the above.
for 33 kV double circuit OHL lattice steel towers, what is the criteria for selecting the back to back distance (distance between tower legs).
is it related to tower height, or tower slop ?.
any reference for the above.
How to calculate the electromagnetic interference generated from a 132kV single core (in trefoil formation) power cable, need to be calculated for diffrent distances, like 1m, 2m,5m.
1500 kVA transformer, 11/0.4 kV Dyn11 installed in a substation
what is the standard or practice for earthing the LV side neutral point ?
is it required that the neutral point should have a separate earthing point/system or it can be connected with the substation earthing system?
what is the...
0n 415 V TT earthed system, Can we use Residual Current Device (RCD) at load side.
I'm having a case where RCD is tripping when we supply from portable generator with unearthed neutral, but not tripping when we supply from a transformer with earthed neutral.
For battery sizing, can we convert a load (A) for 150ms to equivalent load for 1 sec, as a percentage value
e.g. 180 A for 150ms is equivalent to (150ms / 1000 ms) X 180 = 27 A for 1 sec (1000 ms)
This is required as the minimum time duration which we can use in battery sizing software is 1 sec.
33 kV cable, 10 km length being laid in sections of 500 m,and in order to control the test results, for each section the cable sheath is tested and another sheath test is done after jointing each section and finally a sheath test is done for the hall cable length with joints and...
Is it possible that zero sequence impedance is equal to or greater than positive sequence impedance for a power transformer, whose connection is Dyn 11 33/11 kV, 15 MVA ?
We had a case where a transformer(20 MVA) differential protection tripped under motor starting (3.3 MW motor), what could be the reason for that.the transformer was loaded at around 16 MVA at the time of motor starting.
YNad1 400/220 kV, 400MVA , Z%=12.5 autotransformer
how we can present this transformer in fault calculations program where auto transformer is not available in the program library.
an energy meter (kWhr) with the following name plate spec.
Current 5000:1 A
Voltage 10.5 kV/sqrt(3) : 100V/sqrt(3)
is fed from voltage and current transformers with following spec.
VT :10.5 kV/sqrt(3) : 110V/sqrt(3)
CT :5000:1 A
what will be the error in the meter reading due to voltage...