I have a project that will be grading over peat. I'm wondering about special earthwork techniques to make sure we don't bog down too much equipment.
The site is covered with 2.5 - 3 feet of firm to stiff silt over 10+ feet of peat. The plan is to excavate up to 5-6 feet below grade to...