Can anyone help me find a list of vendors that use CO2 blasting to clean HRSG finned tubes? And give any feed back on the pros and cons of this cleaning method?
Thanks
2 on 1 combined cycle plant. 2 7FA with ATS HRSG to an ABB reheat steam turbine. 4 years old.
Perfromed hot gas path inspection on both GT in October 2002. Noticed a drop in STG output. This was expected due to the lower TEG temperature after the inspection. In February of 2003 we had a limited...