Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: 1906
  • Content: Threads
  • Order by date
  1. 1906

    Chemical cleaning instead of steam purge during refinery S/D

    Re the shut-down of refinery utilizing chemical cleaning instead of steam purge to avoid H.C emission, if you guys have good experiences and materials please let me know. We still wonder whether this practice really good in view of cleaning performance. Your comment will be very helpful.
  2. 1906

    Cleaning method for Refinery Amine System for Gas treating

    To minimize the amount of contaminated water from amine system during T/A period after system cleaning, If you guys have good recommendation on a method of the cleaning the system, please comment us.
  3. 1906

    Recent condenser type in vacuum tower O/H system

    Re the vacuum tower having O/H condenser designed and installed by fixed type cooling water cooler to prevent leakage from atmosphere to system, several questions are raised as below. 1)Fixed type O/H condenser is very difficult to clean outside tube during T/A period. So, we are considering...
  4. 1906

    strainers at the inlet of ejectors for vacuum tower

    Recently we experienced plugging of strainers(60 mesh) at the inlet of ejectors installed at the vacuum tower overhead in our refinery, to solve this problem questions were made as below. Actually, we want to remove strainer and avoid any operational interuption by the plugging of strainer...
  5. 1906

    Re the sulfur tank roof corrosion

    Recently, we experienced sulfur tank roof corrosion and considering installation of steam coil on the outside surface of roof because we think cause of corrosion is condensing of H2S and H2O. Anybody who has comments about our countermeasure, please inform us.
  6. 1906

    Ideas for Lube base oil color improvement

    We have hydrocracker unit followed by lube base oil production unit. This lube base oil unit has been operated with selective iso-dewaxing catalyst and hydro-fininshing catalyst. At the end of run, however, product lube base oil(Group III) color became a little darker. Re this matter, any body...
  7. 1906

    Flowmeter type of the fuel oil supply/return for heater

    Recently we experience two operational difficulties for the heater operation. One is the malfunction fuel oil return ovalmeter which increased fuel oil supply pressure suddenly. Promptly O2 showed almost o% by the increased of oil pressure and increased fuel oil flow. The other was sudden stop...
  8. 1906

    H2 Manufacturing unit HTS Reactor DP Increase

    We have been operating HMP(H2 manufacturing process) for the production of H2 to the refinery. HMP unit consists of purification section(Hydrodesulfurizer/Sufurizer- H2S Absorber), Reformer Tubes and HTS/LTS Reactors. After 10 days later of S/U, HTS reactor dP has been increasing trend. DP...
  9. 1906

    Energy Conservation

    As you guys know well, recent high oil price make us focus on more energy saving than ever. If there is good internet site, your information will help me a lot. And, If there are any good best practice especially in refinery on saving energy, would you guys please let me know.
  10. 1906

    Good practices of management of valves for the refinery

    Re the management of valves for the whole refinery, we recently are in deep consideration for " how we sure the activity of the valves when they worked, for the valves not operated during normal operation". For example, there are some valves a. that is expected to be used only during S/D or S/U...
  11. 1906

    Molten sulfur loading facility with automatic system

    We are producing molten sulfur in our refinery with truck loading facility. However, truck drivers seems to be exposed to sulfur fog (or small amount of H2S) when they check level of loaded sulfur in truck. We don't have automatic system for the checking of loaded sulfur, for the time being. In...
  12. 1906

    Training practices for Emegency Cases

    Anybody who have good traing practices for Emergency cases such as power failure, steam failure, utility failure and etc.. in view of not only methodology but also important technical point, please let me have that information.
  13. 1906

    Suitable Antifoamer in Hydrocracker LPG Amine Contactor

    Last year we changed Amine in H2S ABosrber and LPG contactor in Hydrocracker complex from DEA to MDEA actually formulated MDEA. After changing-out, Hydrocracker LPG contactor foaming(and/or emulsion, whatever called) tendancy has been increased, so, we injected silicon type antifoamer...
  14. 1906

    Sulfur Recovery Unit

    We have 2 of 270Ton/Day Sulfur Recovery Units and S/D,S/U periods are 6/4 days. Re this, if you guys know any up-to-date S/D and S/U procedure to shorten current 6/4 days to 5~4/3~2 days, please let me know.
  15. 1906

    Test method of auto start-up pump during normal operation

    Re the stand-by pumps'(such as auxiliary lube oil pump in forced Lube Oil Type pump or recycle gas comp. lube oil pump system generally consist of steam turbine and Motor pump) auto start-up initiated by Level Low Low signal or Pressure Low Low signal in refinery, How do you usually test...
  16. 1906

    Re SRU steam generator's Hex Head Ferrule Failure

    Re the SRU unit Steam Generator after thermal reactor, we experienced frequent failure on the surface of hex head ferrule and have to find out the reason because of higher operating temperature by the introduction of O2 enrichment technolgy after this coming turn-around. Till now , no specific...
  17. 1906

    Proven technology to improve heater performance

    If any body who knows new proven technology to improve heater(especially fuel oil burning heater)performance without significant investment, please inform me. In addition to this, if there is any good web site explaining energy saving tech. also, please inform me.
  18. 1906

    WHB in Steam Reformer and T/A interval

    Re the refomer unit, there is waste heat boiler at the reformer outlet to recover energy from process gas for a steam generation. But, one or 2 years later this waste heat boiler should be opened in order to inspect and clean because of its' loss of performance. This unwanted WHB cleaning...
  19. 1906

    Designing of open area for oily sewer cover

    Re the oily sewer cover in the refinery process area, any body who knows well about the design criteria for the open area of each oily sewer cover and other basic concepts, please let me know those information or contact points.
  20. 1906

    Flow fluctuation in stripper feed heater having 2 pass

    Because of flow flcutuation in stripper feed heater having 2 pass in our lube base oil production facility, we improvised HP velocity steam line at the inlet of each pass. After injecting HP velocity steam around 2.0 ~ 2.5 t/h to the each pass inlet, pass fluctuation was disappeared but with...