Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: ledon
  • Content: Threads
  • Order by date
  1. ledon

    Welding 17-4 PH to A-36 Carbon steel

    I am not familiar with 17-4 PH bi-metallic applications. Could someone tell me what the best filler metal would be?
  2. ledon

    Heat Treatment

    Looking for the reference materials on general heat treatment techniques and basic parameters for metals. This is to help educate someone without and engineering background. Any suggestions?
  3. ledon

    Requirements for stress relief of Hastalloy piping

    I was wondering if there are any stress relief or other heat treat requirements for hastalloy piping after welding. This is a new material for me. The piping is for chemical service essentially non-corrosive at moderate temperatures.
  4. ledon

    Acceptable filler for alloy 20 Stainless Steel

    What is the best filler metal for GTAW welding of Alloy 20 stainless steel pipe?
  5. ledon

    AFFF Storage tanks

    I am trying to find a list of alternative materials approved for use in the construction of US Naval AFFF system fire fighting tanks. The drawing I currently have lists CuNi 90/10 for the entire tank.
  6. ledon

    Weldability of 904L CRES

    I have been tasked to write a welding procedure for 904L CRES. I have no experience with this grade. Does anyone know a Milspec or ASTM that this grade is manufactured to? My particular questions are welding parameters such as, preheat, filler, PWHT requirements.
  7. ledon

    Titanium Welding

    Can anyone give me a possible supplier for inert atmosphere welding glovebags and trailing gas shields used for open atmosphere welding of titanium?
  8. ledon

    High pressure piping backout requirements

    While most welded pipe joint designs have a requirement for backout at fit-up, I need to know if it is required to maintain that requirement after weld completion and where this is written.

Part and Inventory Search