thread403-437658
In my current project, builder has removed the partition wall between staircase / lobby ventilation shaft and plumbing shaft to make it a single shaft. Basically, they have increased the masonary shaft which is serving the staircase pressurization, before this shaft was split...
Recording studios typically experience varying load profiles, fluctuating between partial and peak loads. When considering the implementation of fixed airflow DX package units for air conditioning within such environments, it's crucial to assess the implications, especially in scenarios where...
Can anybody explain to me the lighting heat gain in the studio as per below CIBSE Guide B table? It seems very significant heat gain.
https://res.cloudinary.com/engineering-com/image/upload/v1708705754/tips/CIBSE_TABLE_yebkmr.pdf
I am seeking clarification on the practical implementation of chiller plant diversity. Specifically, when a chiller plant is chosen with a 75% diversified load, indicating that the chiller sizing is based on 25% less capacity. However, upon calculating the combined chilled water flow rate in a...
I am currently conducting a review of the HVAC design for a project comprising three high-rise towers situated at a single location. These towers are air-conditioned by a singular variable primary flow chiller plant with a total capacity of 15,000 tons. My concern lies in understanding how a...
I am presently engaged in the HVAC design for a hotel encompassing numerous guest rooms. The directive I received stipulates that the air conditioning system should be designed to achieve a minimum space temperature of 20°C for the guest rooms. It's noteworthy to mention that to maintain such a...