I am working on Ver 7 of SP Intools. This is the first time the program is used and was installed in late Feburary.
We have entered all the instruments, spec sheets, loaded JB with Device panels and cables. Connected the 24 pr from field JB to control room Marshalling panel. The next step is...
I have a number of questions, any comments are appreciated.
I am working with a heavy oil pitch wedge meter with extended diaphragm d/p meter. The system is setup with a purge oil. First I would think if I am using a purge then I don't need the diaphram type pads. But I think this happened...