I need to know what thickness of asphalt pavement would typically be needed for a heavy vehicle area. The area is a coal yard for a boiler plant and the traffic will be coal trucks weighing up to 80,000 lb when loaded. The subgrade is 6" of compacted chrushed stone.
I have a specification...
Hello,
I am trying to trouble shoot a gas station pump that is experiencing reduced flow rates. The suction pump is located at the dispensor and is drawing from an above ground tank. I suspect that the tank is too far away and line/fitting losses are causing insufficient pressures at the pump...
I am working on a fuel oil transfer piping system that will draw No. 2 fuel oil from a remote fuel storage tank to a steam boiler. The pump is a Positive Displacement type pump located in the boiler house. I have performed pressure drop calculation on the suction leg of the pump which shows the...