  1. kssschsekhar

    3 Cold starts and 2 hot start

    Hi all, Recently I come across following technical specification clause for MV or LV motor (LV motors can be considered as > 100 kW rating) The clause details are as follows ....Electric motors shall be suitable for two (2) successive starts with the motor already at full load working...
  2. kssschsekhar

    Type Test certificate for 400 Ah and 100 Ah

    Hi all Recently we procured Exide make 100 Ah, 2 V - 55 nos to supply motive power to switchgear. We asked type test certificates of 100 Ah, 2V cells. They provided 400 Ah, 2V (higher rated) type test certificates and mentioned 100Ah, 2V and 400 Ah, 2V cells are same model. Can anybody...
  3. kssschsekhar

    GPR, Step & Touch Potential for multiple voltage Levels

    Dear Folks, PV Solar Power plant has two voltage levels- 33kV and 0.4kV. Solar PV plant is connected to remote end 33kV sub-station through 33kV cable. Local 33/0.42kV transformers are used for auxiliary power supply to solar farm. Ground fault currents at 33kV and 0.4kV voltage levels are 2kA...
  4. kssschsekhar

    Black start Generator Versus Emergency Generator

    Hi all In general, In a power plant (capacity 100 MW to 4000 MW) the following equipment exists. Here power plants are Gas based or coal based. Emergency Diesel Generator and Black start Diesel Generator. Now I would like to know Why can not we club together and install a Black start diesel...
  5. kssschsekhar

    Run/Update short circuit current-ETAP

    Dear Folks, Greetings... In a small Isolated network with two generators are connected to a bus directly (without transformers) and operating in parallel. Each generator's ground (Earth) fault current is limited to 100A due to neutral ground resistor. Each generator has a neutral CT and...
  6. kssschsekhar

    GPR calculation for Low Voltage system

    Dear Folks, If the fault current is 50kA (Ph-E) in a low voltage system-400V, the calculated Grid potential rise (GPR)= 50kA * 1 ohm= 50kV....It is against Ohms law and the potential rise should be less than 400V.... I would like to know why system voltage is not considered in calculating GPR.....
  7. kssschsekhar

    Surge Capacitors & Arrestors for Motor...

    Dear Folks, Greetings...In one of the projects, surge arrestor and surge capacitors are located in MV motor terminal box. As soft-starter has been provided for this motor, is it recommended to change the location of surge protection devices to switchgear end (before soft-starter)? The power...
  8. kssschsekhar

    MV VT fuseless installation

    Hi all ABB make "11 kV univer G" has incomer with fuseless Medium Voltage Voltage Transformer (VT). See the "11 kV board arrangement" According to me it is standard practice and may be followed. However I am not getting supporting document. Can anybody provide supporting stardard...
  9. kssschsekhar

    Test winding in current transformer

    Dear Folks, One of the current transformers has an additional test winding i.e.10A & 45 turns. Main CT ratio is 450-300/1A. Please share your view the purpose of the test winding. Advanced thanks.....
  10. kssschsekhar

    Transformer Bushing Short-time withstand current

    Dear Folks, As per IEC60137 standard, transformer bushing short-time withstand current should be 25 times the rated current for 2-sec. If a fault occurs just after the bushing (inside the transformer), the fault current through the bushing is almost equal to connected supply bus fault current...
  11. kssschsekhar

    Damping coeffcient

    I found the following information in transmission grid code that Generator Excitation Control System ???Control performance of the voltage control loop shall be such that under isolated operation conditions the damping?coefficient shall be above 0.25 for the entire operating range. Could...
  12. kssschsekhar

    Finding DC current breaking Capability of Circuit Breaker

    Dear Folks, Q1. If a circuit breaker is tested for a time constant of 45 milli sec, I"k=40kA, how can calculate DC current breaking capability of circuit breaker? From IEC 62271-100 standard, Figure-9, as percentage of DC component varies according to time of contact separation of the circuit...
  13. kssschsekhar

    Three Winding transformer

    Hi all Separate Generator Step up transformer (GSUT, To step up and export power)and Station Services transformer (SST, For plant auxiliary loads)used to be there in almost all power plants. Generally these two transformers are two winding transformers To meet the power plant one can use...
  14. kssschsekhar

    Rated Short-circuit current vs Short-time withstand current

    Dear Folks, I am looking for clarification on selecting short-time withstand current for circuit breakers and Bus-bars. In most of the calculations, I"k (Maximum symmetrical rms current) is taking as short-time withstand current. In fact, as per IEC 60909 / IEEE C37.013, short time withstand...
  15. kssschsekhar

    Neutral Earthing for 11kV system

    Dear Folks, In one of the Power plant projects, 11kV system is used with solid grounding. Now Black start diesel generator needs to be connected to the same system as stand-by. Both systems need to be operated in parallel during change-over operation. In this case, we would like to use low...
  16. kssschsekhar

    Query in ETAP-Short time Withstand capability of CB

    Dear Folks, Query in ETAP! Even "Max. Through fault current option" is selected in ETAP SC studies, the SC study report gives the "short time withstand capability current" based on "Maximum Bus fault current" for incoming circuit breaker / Generator circuit breaker. How can we get "short-time...
  17. kssschsekhar

    Step-Up Transformer

    Dear Folks, In one of the industrial systems, 33kV and 6.6kV voltage levels are being used by using 220/33kV and 33/6.6kV Transformers. In refurbishment project, 11kV supply is required. As there is no spare feeder available in 33kV level, we would like to derive 11kV supply from 6.6kV...
  18. kssschsekhar

    Energisation of Power Transformer

    Dear Folks, We would like to energise 300/150/150MVA (220/15/15kV) transformer (GSU) with one of the Generators (110MW,15kV) connected to 150MVA winding of the Transformer. Someone please discuss what are the limitations of energising GSU transformer with Generators. Thanks a Lot.
  19. kssschsekhar

    Generator 100% Earth Fault Protection

    Dear Folks, With reference to the attached protection schematic diagram of 153.5MVA@0.8 lag Generator, 100% E/F protection was not considered. With my experience, such higher rating machines require 100% E/F protection. If someone knows, please discuss general / standard criteria of installing...
  20. kssschsekhar

    Three winding Generator Step-up Transformer

    Dear Folks, Looking for expertise advice regarding three winding generator step-up transformer. For connecting two generators to one 3-winding step-up transformer: 1. What is the criteria for selecting percentage of impedance between ST1 to ST2 (between secondary windings)? 2. If one...