Does anyone has experience in EHV/UHV GIS expansion? Without any equipped spare available in existing one.
From old models to new models?
From SF6 to SF& FREE?
References?
Any idea that what could happeded?
Harmonics issue?
No fire resistant concrete walls between power transformers?
Sprinkler system was not operational?
No redundancy?
Others?
For a FEED stage do you know which are the minimum deliverables documents (written, drawings and calculations) needed? Is there any standard/rule for it?
Do you usually use in electrical installations extra loop for MV Cables in origin/from and destination/to?
I believe that is a good solution in case of an event short circuit at its terminals.
I was checking IEC 62271-200 and I did not find anything about short circuit tolerances.
For example SIEMENS MV Switchgear 8DA10 (40,5 kV/2500 A) model has 40 kA (3 sec).
For some project we get IK3"= 40,66 kA.
What is your experience about it?