Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: leo31
  • Content: Threads
  • Order by date
  1. leo31

    on/off chiller unit for a batch production

    Hello there, I was wondering if it is actually possible to use a chiller in a batch production, since it will have to be turned on/off several times a day. From what I've been told, like any machine, the constant on/off cycles will eventually cause some problems, to avoid them one supplier...
  2. leo31

    Air in a cooling tower pump

    Hello there, I went to a learning visit to a plant where there's a problem with air getting trapped into a pump moving cooling tower water towards an heat exchanger. They can't quite figurer out why air could get there since the pump is positioned 2,5 m (8 ft.) under the cooling tower basin, so...
  3. leo31

    Sulphuric acid TRV

    Hello there, I'm trying to help with a side project following up a training HAZOP analysis where it's has been underlined how a PSV might be necessary for a loading pipeline where fluid might get trapped and be effected by solar heat. The fluid is diluite sulphuric acid (at different...
  4. leo31

    undercooling of service fluid during chiller shut down

    Hi there, I went to a learning visit to a small plant where it was intended to use a chiller to cool down water used in a heat exchanger; from what I've gathered they had to stop using the refrigerant unit altogether as they switched their productions from continuous to little batch...

Part and Inventory Search