I have a question in a geo report It states the engineer fill be free of organic material or less than 3% by volume. Is that typically referring to overall organics within the soil content as in microscopic organics that the naked eye doesn’t necessarily see, The contractor is placing fill...
Are there any basic tricks or tips or monitor movement of a mse reinforced sloped gabion wall ? What constitutes a failure? Thanks https://files.engineering.com/getfile.aspx?folder=6dad2c6e-9841-4a60-a92c-069980491eb6&file=IMG_4698.jpeg