We had a project where the utility required isolated phase construction for a 2500a, 480V service.
What they wanted was that the parallel 7 sets of conductors had to be run separated by each phase to the service disconnect.
I never heard of this, and had to research the NEC to verify that was...
We had a project where the utility required isolated phase construction for a 2500a, 480V service.
What they wanted was that the parallel 7 sets of conductors had to be run separated by each phase to the service disconnect.
I never heard of this, and had to research the NEC to verify that was...