Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: MTNClimber
  • Content: Threads
  • Order by date
  1. MTNClimber

    Micropile and Lagging

    Is there any published guidance as to the minimum strength of grout for drilled micropile and lagging walls (fully cased piles)? I’ve seen 4000 psi in the past, which seems overkill. We always spec 100 psi CLSM for drilled SPL. I’m guessing traditional flow fill CLSM might be difficult to pump...
  2. MTNClimber

    Drilled Soldier Pile and Lagging - Wait times

    We have a job with some small and awkward drilled SPL alignments (U-shaped alignment behind bridge abutments). The short spans and shape make the drilled SPL spacing somewhat tight. The typical rule of thumb that I've seen is waiting 24 hours before drilling within 3 pile diameters of a newly...
  3. MTNClimber

    Micropile and Soil Nail Wall Underpinning

    This underpinning project came across my desk for review. I was hoping to get some opinions on the load transfer and resulting deflection of the pile to see if I'm overthinking this. The pile will not be preloaded so the load transfer will cause some amount of settlement of the existing...
  4. MTNClimber

    Foundations on Rock and Soil

    I'd like to take a survey of how you folks typically to deal with strip footings that are supported on rock and soil. I've seen reports require: -Over excavation of the rock by 12-inches and replaced with granular fill. -Transition zones of about 20' long that include over excavating about 18"...
  5. MTNClimber

    Soil nail wall with a 90 deg corner

    We're proposing repairs to a 30' tall MSE wall that is showing signs of movement and distress. One option we're proposing is drilling soil nails through the wall face and then shooting a new concrete face. The only issue we're having is the wall has a 90 deg outside corner. Is splaying the soil...
  6. MTNClimber

    Placement of No-Fines Concrete Under Water

    Does anyone have experience with no-fines concrete when tremie placed underwater? We have a situation where the owner (the State) would like to fill the void between a new bulkhead and an old bulkhead with concrete. We are worried about large differential water levels if the void was filled with...
  7. MTNClimber

    Sea State "Survey"

    I'm preparing a response to a RFP for a project to re-located a University's sailing team building and pier facilities. They are looking for to have the A/E team survey the existing facilities, including "sea state conditions". While I have asked for clarification on this item I'm stuck...
  8. MTNClimber

    295 Retaining Wall Failure in Bellmawr, New Jersey

    https://6abc.com/i295-retaining-wall-bellmawr-new-jersey-rt-42-nj-dot/10448444/ Looks like a nice global stability failure. My contact believes the wall is supported on rigid inclusions by Menard. What a mess.
  9. MTNClimber

    Minimum distance between stormwater infiltration systems

    I have a job that requires 20'-30' retaining walls and 1H:1V reinforced soil slopes for site development. Everything is very preliminary at the moment but the Civil is currently showing large stormwater infiltration systems very close to the walls and slopes. Close enough to make anyone start...
  10. MTNClimber

    Retrieving Dropped Item down Inclinometer

    Long story short, a technician dropped a 10' stainless steel telltale rod down a 50' inclinometer. Anyone have a good idea on how to retrieve it?
  11. MTNClimber

    Liquefaction Analysis for a Pier

    When looking at liquefaction potential for a marine structure, such as a pier, it's common to have a relatively large head of seawater above the mudline. This can drive the effective stress down to a negative value causing a medium dense or dense sand layer to be potentially liquefiable using...
  12. MTNClimber

    Soil Nail Wall with MSE Wall Facing

    I have a soil nail wall to be faced with MSE blocks. Due to space constraints, I plan to require the grid to be installed into the shotcrete facing, with the grid wrapped around continuous #4 bars. Are there any official guidelines for calculating minimum embedment lengths of geogrid into the...
  13. MTNClimber

    Copyrighted Geotechnical Reports

    This question is for the engineers in the USA. I've noticed that geotechnical reports from some companies are copyrighted. Does anyone know why companies are doing that and if there is any real legal action that can be taken if someone else uses their language? It just seems odd to me.
  14. MTNClimber

    Compaction Grouting Cutoff Pressures

    I'm wondering if anyone has input on cutoff pressures for compaction grouting. We'll be mitigating from 100 feet below ground surface up to 5 - 10 feet below grade. The ASCE compaction grouting consensus guide states that most soils are effectively compacted at a sustained pressure with a rage...

Part and Inventory Search