Recent content by Weko

  1. Weko

    NACE MR0175 - Production Weld Hardness Test

    My Client intend to have Production Weld Hardness test for our "NACE" categorize material. We are in a Gas Plant processing (AGRU & SRU). In NACE MR0175. The weld deposite value for WPS/PQR is 250 HV. However HV can not be used for production weld, since it needs to be destructive test. While...
  2. Weko

    Air Fin Cooler on Wellheads

    this is a gas well.. I dont exactly know the ratio between oil-gas-water...
  3. Weko

    Air Fin Cooler on Wellheads

    Thanks for the feed back. Yes, we apply temp shut down incase temp goes high above the limit of the SS
  4. Weko

    Air Fin Cooler on Wellheads

    Dear All, We are undergoing an Gas Plant Sweetening project. My Client is installing an Air Fin Cooler on the Wellheads, before entering the pipeline. The initial use was to reduce the temperature because he said it was too hot for any underground wrapping. Because he already installed the Air...
  5. Weko

    Cladding Valve

    Dear All, I am facing an upstream oil&gas processing facilites project which the client tries to reduce a lot of cost. One of the is "cladding valve". They specify cladding valves such as: - Body Carbon steel with Incoloy/inconel cladded, for gate/globe/check/ball type valves - The ball of...
  6. Weko

    Ball Valve Seat of Pigged Pipeline

    Thanks all for your response. @big inch: Please continue, interesting
  7. Weko

    Ball Valve Seat of Pigged Pipeline

    Dear All, What is the best design for a pigged trunnion Full bore ball valve design. The valve is attached to the pig launcher and pig receiver (to isolate between the pig and the pipeline) 1. Soft seat vs metal seat? 2. Single piston effect vs double piston effect? 3. Any other special design...
  8. Weko

    Sea water hydrotest on tanks

    The roof will be steel. And will be filled with Naptha. And the tank will not be heated. We are still developing our project schedule. But I predict probably two weeks or a month before it is filled. Any suggestion so the inside shell of tank will not corrode? Using internal paint linning?
  9. Weko

    Sea water hydrotest on tanks

    Currently we are designing a floating roof tank with the diameter of 80m and height of 20m. Due to the unfeasible source of fresh water, our client premitted us to do hydrotest by using seawater. Since we are not familiar (experienced) with hydrotesting using seawater. We are still in searching...
  10. Weko

    Forged Flaged Y-Strainers

    What are your pressure, temp and corrosion allowance for the strainer? Most strainers are made by Casting and Fabricated Casting Strainer => The whole body are made by casting Fabricated Strainer => The body are by pipe and fittings. The end body (the flanges & blinds) are by forging. Then...
  11. Weko

    Fire Safe Vs Fire Tested

    Dear All, I come across the requirement for soft seat valves (ie Ball, Butterfly etc). Some requirement mention "Fire Safe Design" and some mention "Fire Tested Design". I am getting confused. If those terms are same or not. In my humble understanding that "Fire Tested Design" shall be...
  12. Weko

    Extneded bonnet vs Normal Bonnet for minus 30 deg C

    We are currently handling a project for CNG that are cooled down until minus 30 deg C. The valves would use LTCS material. We would like to have suggestion regarding the bonnet type. Is minus 30 deg C, can use normal bonnet or shall use extended bonnet? I am thinking of using extended bonnet...
  13. Weko

    Flare System on a CNG plant

    Yes, its compression, storage, and decompression facilities....
  14. Weko

    Flare System on a CNG plant

    We are an EPC Contractor and it's our first time to design a CNG plant. We are currently having an intense discussion with my fellows about the requirement of Flare system for a CNG plant. As many of the CNG facilities (mother and daugther station) existed, do not use flare system. And our...
  15. Weko

    Temperature Limitation in ASME B31.3 edition 2010

    Hi All, Can anybody help explain why in the latest ASME B31.3 edition 2010. They delete Notes (7) in appendix A, which previously limits the temperature of the material? Does it mean that after this deletion, we can use the material abouve the previously restricted temperature? As long we...