Dear All,
I'm presently doing Project Management Consultancy (PMC) activities for polyester continuous polycondensation unit with yarn and fiber spinning units namely POY, DTY, FDY and PSF. Can anybody help me to find forum where I can get support from experts to clarify questions related PET...
Dear all
For one of the project, we have been asked to select Duplex stainless steel material for the Plate heat exchanger Plates as the Chloride content in the cooling water is more than 300 ppm. Vendor had offered for 254SMO and when enquired they informs that Plates are not available in...
Thanks george for your response...
Would like to inform that this is an integrally geared compressor with 8 stages. As this compressor loop is not designed for settle out conditions we have not envisaged to have multiple NRVs as given in compressors designed for settle out conditions. So the...
Thank you very much 1503-44 and georgeverghese for your responses
This Blow off valve is provided to ensure quick depressurization of the hold up volume between the compressor discharge and the NRV. As the Anti surge and PSV tapings are upstream of the NRV and these valves being located at a...
Thanks georgeverghese for your response
As you know the BOV is provided to ensure the quick depressurization of the high pressure CO2 gases in the discharge side of the compressor. The compressor is provided with 2oo3 high pressure trip at the discharge side. Also we have a non-slam type axial...
A blow-off valve (4" ANSI , Cl 1500 Stainless steel SS316 Globe valve) is installed at the discharge line of a CO2 compressor ( Integrally geared) before its NRV and the compressor discharge pressure is 160 barg. This blow off valve is provided with a fail open actuator. . During HAZOP study a...
Thanks a lot for all the wonderful answers. bimr, whether Milton roy is the only vendor who supply this VFD drive controlled volume pumps? Unless we require the turndown less than 10%, the milton roy option would be a costly proposal i suppose.
For the Chemical dosing packages where mostly controlled volume (diaphragm type) pumps are used, for the capacity control, the stroke of the pump is varied either by manual or automatic ( motorised actuator) . Client prefers to have VFD for the capacity control as they have experienced problems...
Thanks to all for the responses. Actually it is a 2.5 MW DG set for a fertilizer plant and we have 3 machines of the same size to be integrated. This DG is not for captive power generation but for Emergency power (when the Gas turbine generator fails )for safe shutdown and during start up of the...
We are finalizing the Diesel Generator specification and as per Client specification we have asked to consider redundant AVR for the DG set. Any significance on this requirement? Cummins do not have this feature.
Thanks to clarify.
In one of the Shell and Tube Heat Exchanger in the Polypropylene plant , the low temperature service calls for the LTCS material for the tubes . But the chloride content in the circulating cooling water is as high as 600 ppm. The temperature of cooling water outlet from the exchanger will be...
Dear all,
We are now doing FEED refinery project in West Coastal Region of India in which a substation is envisaged around 2000m². The max ambient temp is 45°C. Substation building accommodates switch gears, panels, MCC, MLDB, etc. I understood from some of the owner specification in previous...
We are in the process of fabricating steam lines for a heat exchanger. We have ball valves of 6" and 4" size for 50 barg pressure that are to be welded in this steam line. The steam is used only for this heat exchanger and then gets connected to the Low pressure steam header after exchanging the...
Dear bcd
I agree with your views. However in this present application, there is no temperature rise expected from its ambient temperature ( 35 Deg C) and pressure is defined by the discharge pressure of the dosing pump ( 2 bar)and is injected inside the tank that are operating at atmospheric...
Hi Danlap
Thanks for ur prompt response. coming straight to the point, the present construction at site calls for immediate dispatch of the valves that are designed and complying to FET class B where as specification calls for FET Class A. As you will be aware the design of the valves between...