ETAP -- INSIDER INFO
(of which I used and tested earlier revisions for pre-release)
ETAP was created by downloading and copying/modifying the power analysis routines off of a main-frame computer used at Fluor corp., by a then employee and former college instructor, Farook Shakooh. It was kept...
Halleluyah Amigo! I have downloaded the information referenced by your thread and am elated as it saved me $2400 in Naitonal Technology Transfer Course fees! The information from those sources is quite thorough, and even though I have experience in PLC's and ladder logic it is also...
Thank you gentlemen for taking the time to help on this issue. I would like to answer a couple questions asked by Meihm and ask a couple more myself on this matter.
Yes the house is wired in two wire romex, and the new panel will remove and replace the current main panel.
I am insisting that...
Gentlemen,
A new and larger circuit breaker panelboard with main breaker is needed to replace an existing breaker panel and sub-breaker panel in a single residential garage, in california. The plan is to use the sub-panel as a feed-thru j-box and remove the existing breakers, as the loads will...
Greetings,
Has anyone the Pin-Out for the external, front connector on the CPU card for a GE Series ONE PLC? By this I mean which pin is input, which is +v, which is -v, which is output, etc.
Steve Edwards, P.E./Edwards Technical Consulting/619-262-0936