Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by SQUIDALE

  1. SQUIDALE

    filling voids above underpinning

    Thank you for your comments.
  2. SQUIDALE

    analysis of exterior CMU elevator tower

    Epr- Thanks for your comments. Will be careful about tying in the walls that allows for some increment of vertical differential movement. This will probably also help another concern I have which is shrinkage in the new block. Thanks.
  3. SQUIDALE

    filling voids above underpinning

    Hello- My office is underpinning a c.i.p. concrete column spread footing and adjacent continuous concrete wall footing with concrete, placed in phases. Comments in a previous thread on this topic were very useful but I have an additional question. In plan, the column footing to be underpinned...
  4. SQUIDALE

    analysis of exterior CMU elevator tower

    Hello- I am designing a cmu elevator rower to be added to the exterior of an existing masonry building as a "bump-out". The elevator shaft is basically a hollow masonry tube, extending three floors up. Wind, seismic and elevator rail loads parallel to the existing wall that I am bumping out...

Part and Inventory Search