  1. sixaparrat

    Does speed matter when static rolling with a smooth drum roller?

    from 36 years experience, 2.5 km/h max. Cheers, Chris
  2. sixaparrat

    highway questions

    Also bear in mind that the surface often fails due to deflection of the subgrade, which will be less (usually) with a concrete subgrade such as a structure. So maybe no remedials required? Cheers, Chris
  3. sixaparrat

    Getting error code "100" from wild heerbrugg dmi5s distomat

    I don't know which fault the code signifies, but the usual fault that I used to get was either too weak or too strong return signal, the remedy was gently tapping the top of the unit to free the cascade filters. That was on DI3S though. Cheers, Chris
  4. sixaparrat

    GENERATION OF UNLIMITED ELECTRICAL POWER WITHOUT USING HYDRO-CARBONS OR NUCLEAR ENERGY

    pumped storeage is only effective if using off-peak supply. The unit in North Wales , Dinorwig, is rated at 1.8 GW with a run up time of 10 secs and was designed to be 75% efficient, with a 600m head 10m diameter main shaft. Cheers, Chris
  5. sixaparrat

    Minimum number of days beween pours at joints in RC base slab

    I assume that you are already pouring the slabs in a hit and miss sequence, you should be able to get a pour every day assuming more than 8 bays Cheers, Chris
  6. sixaparrat

    Anybody seen a modular block wall made of these things?

    Yep definetly 6-way cable ducts Cheers, Chris
  7. sixaparrat

    Meaning of Earthworks

    - LEVELLING AND GRADING - EXCAVATION - BACKFILLING - COMPACTION - SOIL DISPOSAL yes Plus in UK - Replacement of topsoil to side slopes/verges etc - Completion of Subformation - Completion of Formation - Placing and compaction of "capping " layer - Excavation of "Cut-off"(interception) ditches...
  8. sixaparrat

    timber profile alternative

    My firm has used GPS systems on our last 5 major roads (ca 100km) schemes, and they are very cost effective, ruling out several setting out teams, and reducing the standing time due to damaged/lost/missing setting out to almost zero. Cheers, Chris
  9. sixaparrat

    timber profile alternative

    Try GPS machine control, from Topcon or Trimble for the roads stuff, costs abit to start off, but saves a forest of timber Cheers, Chris
  10. sixaparrat

    Wild (Leica) distomat error 55

    From memory I think that the shutter may be a "cascade filter" and it is probaly this which is malfunctioning. I don't think that you can avoid a Dealer Service.%-( Cheers, Chris
  11. sixaparrat

    Wild (Leica) distomat error 55

    Further to above , check out page 3 of the link especially wrt adjusting the DISTOMAT head Cheers, Chris
  12. sixaparrat

    Wild (Leica) distomat error 55

    Try this. http://209.85.229.132/search?q=cache:Fb77r2Q_etgJ:home.agh.edu.pl/~owerko/DI%25201001/instrukcja%2520Di%25201001.pdf+Wild+DI1600&cd=5&hl=en&ct=clnk&gl=uk 55 appears to be - Interference during measurement (e.g no return signal, break in beam, excessive air turbulence) Close range...
  13. sixaparrat

    Basic guide for survey stationing (metric and imperial)

    Not sure if this a general thing but I prefer Start 00+00 to end 150+00 Cheers, Chris
  14. sixaparrat

    Terramodel Stripping

    Further to above post, stripped material will be measured beneath embankments as well as above cuttings
  15. sixaparrat

    Terramodel Stripping

    Sorry if I'm teaching granny etc but.... 1)Register the stripping surace after the original ground surface 2) associate the material that was stripped with the Original surface 3) associate the cut material with the stripped surface all as attached screen shot...