We have an existing flare header system designed long time ago. Recently we have discovered the gas flow in the emergency discharge case exceeds the recommended limit 0.5 Mach in header and 0.7 Mach in the tail pipes which connect to the PSVs. Since we don't plan to change the size of the pipes...