Hi
Spares for the Mark VIe are becoming obsolete. For a 45 MW steam turbine , what other control system we can use instead of Mark VI? The system is very complex, the spare cards are very expensive and very long delivery delay. Can we replace with Woodward or another system?
Waross: We do not have this system of motoring the alternator at start up. To start up, we run on barring gear for some time and then increase the speed of the turbine through a ramp defined in the PLC by opening the control valve and supplying steam from the boiler until nominal speed and then...
The turbine and gear remain the same. They will be connected to a smaller alternator of size 46 MVA. Output of gear speed to the alternator is the same i.e. 1500 rpm
Hi
Due to breakdown of an alternator 60 MVA, can we replace it with another alternator 46 MVA?
We intend to replace only the alternator; the gear and turbine will remain the same.
Please see details below
Bigger plant...
Hi
We have Firetrace system installed in our electrical panels since 2017. Some piping are starting to crack. All our electrical rooms are clean, air conditioned. Have any one encounter this issue? Any idea what is the lifetime of the Firetrace tubing? Thanks
Hi
We have 2 turbo alternator exporting to utility grid. One turbo alternator tripped by reverse power and generator breaker opened. From fault recorder, we do not see a big fault or disturbance on the network. Feedback from Utility: they were switching flow of power to another substation.
Any...
Hi
We are a power plant. Since construction, lightning rod were installed on the boiler, substation 66 kV, lightning arresters on 66 kV lines and earth cables over 66 kV transmission lines. Over time 2 additional small power plants were constructed. They are not sufficiently protected against...
Hi
We have a Siemens Scada system, 2 servers, 1 process historian. We intend to renew this part as we are having some issues with 1 server. It was renewed in 2015 and previous system installed in 2007.
We have 2 power plants exporting to national grid.
We belong to an international group which...
Hi
There are Basler 250 on 3 hydro plants. We have 1 spare Basler 200 in our store for another turbo-alternator. Can the hydro plant replace their Basler 250 with Basler 200 in case of breakdown?