Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by roneill

  1. roneill

    Timber Frame Dwelling in Ireland

    The 60 year life span is a requirement set out in the British Standards 7543:1992. I am concerned about dwellings that are built in compliance with this current requirement. I want to know what possible problems or what actions are to be taken after the 60 year life expectancy of the timber...
  2. roneill

    Timber Frame Dwelling in Ireland

    Hello, I am an engineer curently working in Ireland. I am looking for advice on timber frame constructed dwelling and what to look out for at the various stages of construction. Is there any so called common problems. I have also heard that the life span of timber frame constructed house is 60...
  3. roneill

    Timber Frame Housing in Ireland

    Hello, I am an engineer curently working in Ireland. I am looking for advice on timber frame constructed dwelling and what to look out for at the various stages of construction. Is there any so called common problems. I have also heard that the life span of timber frame constructed house is 60...
  4. roneill

    How to calculate the volume of fill

    I have a site layout where i need to calculate the volume of fill currently on site. The layout has contours shown, at which i have taken a section through each one, and calculated the area under the curve. Is this correct and what is the next step to take. I have the dimensions of my site. Is...

Part and Inventory Search