Check FEMA maps to determine the Finish Floor Elevation. You may have to fill the site with import material.
Instead of a deep septic system, you could have a wide/shallow septic system, and have a network of perforated pipes to discharge the effluent from the septic tank for percolation...
Never mind. The Tracks are on a Horizontal Curve. Hence Superelevation covers for about 3.5 cms of grade difference. The rest 1.0 cms can be adjusted out in the field. Anyways, please answer this.
What is the ABSOLUTE decimal precision that can be implemented out in the FIELD? On the computer...
Is there any Allowable Minimum Transverse Slope between the two Railway Tracks. An existing pair of railway tracks are crossing a roadway whose longitudinal slope is 1.07%.
Do we have to flatten out the roadway where the tracks meet? Or could we go ahead and have a gentle transverse slope to...
Hi All,
I need help in kind of estimating the cost of working a land development project with about 82 lots on a 26 acre parcel in Central Valley region in CA. What is usual charge per lot to take-up the project. Your insight will be helpful Thank you.