Hi Jike,
I appreciate your input. We looked at these scenario and both were not in place.
slabs were flush with top surface of top flange and concrete has two inch gap from each column all around.
I am sure it is only friction, but want to discuss and see how other engineers thought about it...
Thanks hokie66 for your comments.
We have engineering drawings and there is no such type of connectors. I agree with you that engineers in 60 have done very smart design. They do have choice of using studs or other connectors but they did not use studs. There must be some mechanics to transfer...
Hi All,
I would like to have your feedback/thoughts on my current issue.
I am working on old industrial(process) structural steel building 1960 era. it has 6 floors and a roof. All floors have 5'' concrete slab on steel beam. There is no metal deck, no shear studs and no horizontal bracing...
Thanks kootk for detail description.
I can consider this situation better than CS bolt and CS painted plates.
Can you refer to any Refrence material for further insight into this subject.
Hi,
I have concern on using galvanized bolts for structural steel connections due to bimetallic corrosion.
Have any one used galvanized bolt on painted structural steel. Main Purpose for galvanizing is to protect bolts
from corrosion, however i read that in this particular scenario (carbon...
Thanks for one for your feed back. I have same opinion as JAE. I am not sure about the permit
is still open or not. I will check with authorities.
Thanks
Hi All,
I would like to get your opinion on previous code and current code application;
A Industrial complex was built as per IBC 200x in 200x. I am not providing specific details. Owner engineer pointed out many deficiencies and code non-compliance during construction. Owner and EOR did not...
Hi,
I am analyzing a industrial building with many vibratory equipment on elevated floor.
I isolated a portion of a floor from col. to col. and performed a dynamic analysis to calculate fundamental mode of floor.
My results are so scattered in x,y and z direction and mass participation is very...
Thanks for your feed back. Building has many floors at various heights. it has vertical bracing system over the plan in various bays. My concern is if I provide expansion joint at purlins, did i still need to design my building for temprature loads or ignore them.
Hi,
I am working on a 350ftx185ft building - 175ft to 150 ft high. . Temprature difference (winter and summer months) is 80F. Building is heated but not air condioned. I have following issues to discuss
1- No expansion joint - should we design for temprature load. if yes - loads are so high it...
I am working on a industrial building. Elevated concrete floor on a composite metal deck. This is a electrical floor with some opening in the floor.
Welding between metal deck and steel beam depends upon shear force transfer through deck.
I am confused about the shear force.
Q.1
IS it only...