A Supervising Electrician or Master Electrician is that person that is licensed by the
Authority Having Jurisdiction to pull permits to do electrical work.
The examination for that position varies from municipality to municipality.
Therefore the exam may be one hour to seven hours. The...
Why would one deliberately cut the grounding conductors on an aerial distribution system?
I have observed this situation on several industrial aerial distribution systems.
The grounding conductor is removed from the grounding electrode at or near the base of the pole. This conductor connected...
100 Amp FSQ Dead Front
Interlocked
Cl. I, Div. 1 and 2 Groups B,C,D
Cl. II, Div. 1 and Groups F,G
Cl. III
NEMA 3,3R,4,4X,7BCD,9FG,12
Explosionproof
NEMA 4
Watertight
ENR Dead Front Interlocked 2P
Circuit Breaking Receptacles
ENP Plugs General Purpose
ArkGard® 2; Factory Sealed
Cl. I, Div. 1 & 2, Groups B†,C,D
Cl. II, Div. 1 & 2, Groups F,G
Cl. III
NEMA 3,7BCD,9FG,12
Explosionproof
Dust-Ignitionproof
Raintight
Wet Locations
Doesn’t a 100 % rated over current devise have to be supplied with 75 degree C cable Ampacity not 90 degree C Ampacity.
Overcurrent devises above 100 amperes are Listed for use with 75 degree C cable Ampacity.
NEC 110.14(1) (b)
I thought that only listed thermal magnetic circuit breakers, could be used as a panel disconnect and over current protective devise. Magnetic only (MCP) are UL recognized devise and can used only with a listed starter combination that has been evaluated by UL.
The 150 amp thermal magnetic...