Hi,
I have a 5 ft deep and 7 ft wide drain with two perforated pipes placed on 1 ft over cobble base. Basically entire drain in filled with cobble. Head loss on one side is taken into count and the flow will be above the perforated section of the pipe the entire time. The pipe is schedule 40-...