Hi
Thanks Kootk
On second thought , I too agree with your suggestion.
Few more doubts.
Why compression steel is not contributing to punching shear strength ? For my case , Ast1 & Ast2 are almost same area.
Why BS 8110 is considering critical section for punching at a distance of 1.5 * d ...
Dear All
We are designing a foundation having two RCC slab as per BS 8110.
Three layer of rebars provided. Refer attached PDF file
As per BS 8110 , for calculating punching shear capacity we have to consider % tensile reinforcement.
Critical section for punching shear is at a distance of...
Thanks Transmissiontowers
We follow Indian code IS-5613 for lines in our country. We are doing lot of works for other countries also where we follow EN , NESC etc. Most of the time client specify required distance. As per my observation it is same as live metal clearance required under no...
In IEC 60071 ,why there are multiple values for one system voltage. For example for 220 Line.
System highest voltage = 245 KV
Short duration power frequency withstand voltage 360,395,460
Lightening withstand impulse voltage 850,950,1050.
May be silly question , As I am Civil engineer.
Thanks...
How to calculate required distance between arcing horn on insulator (Line side to tower side) of 220 KV transmission line for line having altitude of 1500 m to 2000 m above mean sea level.
Does this distance depend on elevation of line ? Does it depend on rated impulse withstand voltage of...
How to calculate required distance between arcing horn on insulator (Line side to tower side) of 220 KV transmission line for line having altitude of 1500 m to 2000 m above mean sea level.
Does this distance depend on elevation of line ? Does it depend on rated impulse withstand voltage of...
How can we develop ( Manual / Excel sheet ) sag tension calculation of conductor considering creep effect ?
We are doing this using PLS Cadd . Is there any books / reference material so that we can match the result of PlsCADD in excel / Manual calculation ?
Thanks
Nitin Patel
1-MT stand for metric ton
2-100*100*7 is steel angle section ( L shape )with both flange having 100mm width and 7mm thickness.
3-Minimizing wastage is main criteria.If we minimize wastage balanced material can be used for other project.
4- ???
5- YES [wink]
Regard
Dear all
During cutting if remaining Pieces length is less then 500 mm then it is a wastage.
If it is more than 500 mm then we can consider that same pieces will be utilized for other project.So minimum wastage is the goal.
Also please note that cost is define as $/MT. Excel file is...
1 - You should not ( Can not ) count splice plate and splice angle area for net area calculation.
2 - No of holes for deduction minimum Four ( In case of no zig zak failure). For design consider Six to Seven in PLS.
3 - 103% ( With out considering splice plate & angle )is OK as in real...
Can someone suggest how to determine optimum cutting schedule from a give stocks of angle sections using excel?
Stock data
100*100*7 ---- 5000 mm 150 qty cost 1000 $/MT
100*100*7 ---- 6500 mm 25 qty cost 1050 $/MT
90*90*6 --- 6500 mm 100 qty cost 1020 $/MT
90*90*6 ---- 5500...