I have a question in a geo report It states the engineer fill be free of organic material or less than 3% by volume. Is that typically referring to overall organics within the soil content as in microscopic organics that the naked eye doesn’t necessarily see, The contractor is placing fill...
Sorry I didn’t upload the photos properly, but I agree thanks for your advice. Yes it was very odd, no rock at them foundation nor face of baskets. Naturally erosion has washed much of the soils already i can
Stick my arm all the way at some point through the face of baskets. And then deep...
Are there any basic tricks or tips or monitor movement of a mse reinforced sloped gabion wall ? What constitutes a failure? Thanks https://files.engineering.com/getfile.aspx?folder=6dad2c6e-9841-4a60-a92c-069980491eb6&file=IMG_4698.jpeg