Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by lutein

  1. lutein

    Hollow Core Slab Camber

    This may be an old question that everyone has asked before, would really appreciate the help. Looking thru the hollow core planks catalog for my project, I noticed that the planks may have 1" camber in it. 1. What does this really mean for the topping slab? Should I increase the topping slab...
  2. lutein

    Topping slab in hollow core plank as diaphragm?

    Ron: I would really like to go that way. Brad805: What kind of gypcrete thickness you've used in the 4-stories? 3/4" or 1" or 2"? Thank you all for input. It would have been an easy decision if the code were to forbid the method. Calculated a maximum ultimate diaphragm shear of 0.8 k/ft...
  3. lutein

    Topping slab in hollow core plank as diaphragm?

    Kootk: Agreed, you have a good point about the labor to pour topping versus gypcrete. Very insightful discussion and greatly appreciate the opinion. I guess I need to contact the contractor for some pricing exercise.
  4. lutein

    Topping slab in hollow core plank as diaphragm?

    Well, if we go with 0.75" gypcrete, we save about 18psf per floor, and for 5 stories it's 90 psf, and that's significant. 0.75" Gypcrete = 7 psf 8" bare plank = 54 psf (from Old Castle catalog) 8" plank + 2"topping = 79 psf (from Old Castle catalog) For buildings in SDC A-C, either method is...
  5. lutein

    Topping slab in hollow core plank as diaphragm?

    Ron: I appreciate your concern, and I am myself as well. Just want to clarify: you mentioned "I have not seen a multi-story hollow core/masonry project in Florida without a topping slab..." this 'topping slab' that you referenced, do you mean by structural topping slab for diaphragm or just...
  6. lutein

    Topping slab in hollow core plank as diaphragm?

    Agree, I am all for topping slab, no doubt it's the best practice for a reliable diaphragm, I was just wondering if untopped hollow core plank has been used for multi story structure. I have also found a project done locally where light weight 2" non structural topping is used.
  7. lutein

    Topping slab in hollow core plank as diaphragm?

    Ron and KootK, thank you for the valuable input, greatly appreciate it. Another alternate to a diaphragm topping slab is physical plank to plank connection with shear ties or embed plates. Totally agree on the chord strength and continuity. Found a good article abstract from FEMA P751 showing...
  8. lutein

    Topping slab in hollow core plank as diaphragm?

    I am working on a 5 story hollow core plank on CMU wall projects in Florida, ie no seismic. As permitted in PCA hollow core design manual, I managed to get grout filled core to work as diaphragm action lateral load distribution. However, I have heard concerns of reliability of grout filled...
  9. lutein

    Conflict in Risk Category Table

    We are working on a high rise hotel with a meeting room space hosting more than 300 people; in our opinion, the structure should be categorized as II. FBC 2010 Risk Category Table 1604.5 clearly states that Risk Cat III is meant for 'structures whose primary occupancy is public assembly', in...
  10. lutein

    Drilled Shaft Details

    Thanks for all the replies. KootK and hokie66: the shafts are 48" and 60" in diameter. you have a point about formwork and beam reinforcing labor. oldrunner: the geotech does not touch on grade beam detailing. they have provided us the shaft capacities.
  11. lutein

    Drilled Shaft Details

    I am seeking help in detailing of drilled shaft foundation system for concrete shear walls. I have some standard details that have been used but want to make sure it's applicable. Structure is a 14 stories concrete building with stairs and elevators as shear wall cores, i.e. 4 sided box...
  12. lutein

    Welded Aluminum Design

    Sorry that I was not clear. Yes, the allowable stress was too low that nothing would work. I am just curious if a small tack weld at bottom of beam would cause the whole section to have to use the low weld strength.
  13. lutein

    Welded Aluminum Design

    Greetings. I am designing a continuous aluminum beam, 2 spans, with square tube section, 6063-T5. the ends of beam and intermediate supports are to be welded to another aluminum beam. The welded yield strength is much less than the non-welded, and the code specifies that the welded strength...
  14. lutein

    Deflection of Gypsum Board (GWB) Shear Wall

    We have a small one story wood structure, that we are using gypsum board as interior shear walls for wind resistance. We are trying to determine the shear wall deflection, which is a simple calculation for OSB or plywood sheathed shear walls (IBC Section 2305.3), but we could not find the Gt...
  15. lutein

    E-glass sheet structural design

    I am a building structural engineer trying to design a fiberglass sheet to withstand some loading. I am not sure if I got my head straight on this; I am so excited that I found this forum where all the experts in plastic/fiberglass talk: Basically, it's a 12'x12' sheet, supported at every 4'...

Part and Inventory Search