If I set the ground tap = 0.3 I phases and the instantaneous is set to 30 times but the max setting at the relay is 20 times.
Is a good practice set the ground tap in a bigger value (0.6 In ) and then set the instantaneous to 15 times for use the instantaneous setting?
Thanks
Jairo
Are you sure that The transformer is energized phase R - U ; S -V and phase T to W because under other circunstances the transformer is DYn1 and you have problems
if this is the problem you can change the settings and set the relay to DYn1
I live in Colombia and excuse me by my english.
We have the same F4 controls
I´m agree with DPC and we had problems with downstream faults but the force between conductors make a fault upstream; this new fault is only view by the upstream protection.
If you don´t understand me I will try to...