    Soil Temperature for Buried Pipeline Fluid thermal analysis

    It is well known that buried pipelines get an insulating effect from adjacent soil mass. Can anyone cite references where the temperature of the soil just below seabed has been measured and reported? This could also have been used in the analysis of temperature gradient of the fluid in the...
  2. Hariharan

    Pipeline C.P. Design

    Here normally 1.5mm bars @ 50 mm spacing are used as a mesh for reinforcement. This is bare steel and works out to nearly 20 % of the steel surface area! Not considered by anyone. M. Hariharan
  3. Hariharan

    Pipeline C.P. Design

    Naren. Thanks a lot for the info. I am trying to gather info against an Exxonmobil type of situation! Could you refer me to some Oil company specs which may be available on the net, which specify Cl. 6.5.3 I did raise the point of current drainage due to reinforcement with my colleagues. Their...
  4. Hariharan

    Pipeline C.P. Design

    Roscoe, Thanks. When did you execute this project? DNV RP B401 (1993) has a definite breakdown factor for FBE coating without any overwrap and for FBE with adhesive and polypropylene type overlays. There is none for FBE + concrete coating. There is however, a category called 'any equivalent...
  5. Hariharan

    Offshore Pipeline C.P. design

    I am looking for the basis for determining the coating breakdown factor for a submarine pipeline coated with about 500 microns of Fusion bonded epoxy and having a concrete weight coating of 1-3 inches. This type of system, I understand, is common in GOM. The coating breakdown factor is...
  6. Hariharan

    Pipeline C.P. Design

    I am looking for the basis for determining the coating breakdown factor for a submarine pipeline coated with about 500 microns of Fusion bonded epoxy and having a concrete weight coating of 1-3 inches. This type of system, I understand, is common in GOM. The coating breakdown factor is required...
  7. Hariharan

    API 650 Standard Tank Design

    My company designes a lot of tanks for the petroleum industry. I have not been directly involved, but have a number of colleagues who are. 40,000 barrel is about 6000 m^3, which, incidentally, is at the smaller end of tank sizes! (IJR). The largest tanks are in the >70000 m^3 range. (80 m...
  8. Hariharan

    Wind Load on Pipe Rack

    If there is a cladding 18' deep, it certainly will provide a lot of shielding to a similar cladding 20' on the leeward side. You should consider a shape coefficient of 1.5 for the windward cladding. The shielding coefficient for your case should be available in some codes. (I know Indian...
  9. Hariharan

    Distribution of horizontal shear stree by BS8110, cl.5.4.7.2.

    The basic question asked by Jasonlee seems to have been missed out. I am also interested in this topic albeit for a slightly different reason. What is the consideration required for proper bond between old concrete (precast) and new concrete (in-situ)? We recently designed a jetty with grid...
  10. Hariharan

    Superstructure-Pile Interaction considerations,any logic?

    IJR, Further deliberations: 1. Piles should be mandatorily attached rigidly to the slab. i.e. the connection should be a moment connection. I am not very comfortable with pin connections in concrete! The point I had made was that if the top soil is quite weak, it does not offer much lateral...
  11. Hariharan

    Superstructure-Pile Interaction considerations,any logic?

    IJR, This should be an interesting project! 1. Being in Zone 4, I expect you will have shear walls to resist lateral loading, so as not to stress the columns in bending. This would put rigidity into the superstructure whose natural period would be quite low, and the response spectrum ordinate...
  12. Hariharan

    Superstructure-Pile Interaction considerations,any logic?

    Depends on what structure it is, and what is the sensitivity of the results to foundation behaviour. What is the structure you have in mind? What analysis are you planning to perform? Static, dynamic, seismic ? Hariharan
  13. Hariharan

    Foundation failure mode

    FSS, Your question is perfectly valid. An individual element, when stressed to the limits, will behave differently (inelastic, plastic, in contrast to elastic behaviour assumed in analysis). The structural system will not fail until the structure is unable to carry any additional load, i.e...
  14. Hariharan

    what corrosion inhibitor?

    You should define 'Marine environment'. Is it for components above water, but in a salt laden atmosphere, or is it for components which are subject to alternate wetting and drying, like tidal/splash zone, or for components permanently submerged in water? I would be skeptical about using epoxy...
  15. Hariharan

    Lifting and handling of 220 tons (english units) Railroad Bridge

    Rod, The largest single crane lift we have had in India was about 2100 tonnes, and double crane lift was about 4500 tonnes. At other locations, with some other barges, higher lifts would have been executed. I don't have the details. There are a few floating crane barges with twin cranes. The...