Recent content by grampi1

  1. grampi1

    Restrictions Related to the Use of ERW Pipe

    Our practice when considering stock ERW for offhsore pressure containing service is to have a third party inspection outfit double check the seam weld using UT to an N5 notch criteria. We also do two weld line charpy test sets per heat to verify weld has min API body toughness.
  2. grampi1

    Galvanic corrosion rate of Fresh carbon steel with rusted carbon steel

    To calculate the rate you would need both the corrosion current in the connected and polarized condition as well as the anode surface area. Bur basically large cathode (old steel) small anode (new steel) = trouble. I have seen 2-3mm/yr from such situations.
  3. grampi1

    HIC

    Quite low chance of passing unless the steelmaer takes the propper precautions in ladle practices and casting.
  4. grampi1

    cracked bolts on heat exchanger

    Normal B7 bolts can crack if the LPG (shellside?) is sour. Is it sour? Did the bolts fail in a brittle fasion, without elongation? Was bolt hardness checked?
  5. grampi1

    Elastomers

    Do not use NBR in sour service. NBR is a very common elastome used un industry, but is not suitable for soir service.
  6. grampi1

    Conern with machined flanges, possible stringers and defects

    I think the issue is how was the starting bar made? May have been made using good practices and there will not be a problem. Could have been made with less good practices. Some examples would be: Low reduction ratio - May still have coarse grains, hydrogen cracks from casting...
  7. grampi1

    intelligent pig -Preferential Weld Root Corrosion

    While PWC occurrs, it is unpredictable. So should pig because you have a pipeline, and PWC is one of the issues to look for.
  8. grampi1

    Internal Corrosion for dry CO2 pipelines

    I think what he is asking is what dewpoint he needs to achieve in dehydration to assure no water can drop out. Fr that he needs access to a process engineer who can run an equation of state simulator. Generally, a good TEG plant can do the job for CO2 pipelines.
  9. grampi1

    API 5L X52 Modified ?

    Modification has no formal and consistent meaning. It really means one or more compositional elements will fall outside the approved values in 5L, or an additional element is being added that is not normally present. Have to ask the owner of the specification requirement what they mean. My...
  10. grampi1

    Carbon equivalent F65

    So you all think toughness and strength will be just fine at 0.44 but not 0.40 and 8" thick Q&T F65? Might want to check to make sure.
  11. grampi1

    Thermoplastic Liner Design

    The attached website has what you are looking for. http://swagelining.com/
  12. grampi1

    Absorber tower repair with Alt PWHT

    Union Oil Lamont - Look it up http://www.twi.co.ir/download/case_studies/180%20-%20Union%20oil%20amine%20absorber%20tower.pdf Eng-Tips is not a responsible technical authority. Hire a an experienced consultant. This is not a service to mess with.
  13. grampi1

    Elgiloy vs. Inconel 718 for 17% H2S service,

    Elgiloy is a good choice. We would not use X750 in 17% H2S. Several failures of X750 can be found in NACE papers. We also have had one Elgiloy spring failure in highly sour service. We think it was over cold worked and was near strain exhaustion as new. Who checks hardness of thin flat...
  14. grampi1

    stelliting ball from ball valve

    Sam, How did this get resolved? Wellheads have chokes to take the pressure drop so that other valves don't have to have full stellite. It makes no sense to ask for more than the seating area of the ball to be stellite coated. On the wellhead gate valves, only the sealing surfaces are...
  15. grampi1

    API 5L general query

    The issue is the pipe mill is not required to test to a high percentage of SMYS and so may be a lot lower than field hydrotest pressure. Users should supplement 5L requirments and be specific about what % of SMYS they require the pipe mill to test at.