Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by Goble Pile Check h2r

  1. Goble Pile Check h2r

    Dynamic Load Test (DLT) - Pile Driving Analysis

    thread592-22013 in the above thread @Gakei mentioned WS in PIT/PET test is higher than WS in DLT test, it is because PIT/PET is low strain. Concrete is behaving non-linearly, with higher Modulus (tangent or secant) at low strain, hence higher WS

Part and Inventory Search