  1. DHKpeWI

    Rebar Shops

    It is my understanding that the concrete contractor will build from the rebar place (shop) drawings and not the structural drawings. We have a project where the rebar shops don't show a lot of information (like spread footing locations and wall elevations) and the rationale is that the...
  2. DHKpeWI

    Concrete Poured after 90 minute limit

    Concrete was poured at a shear wall at about 110 minutes. According to ASTM C-94, "The discharge of the concrete shall be completed within 1 ½ hours after the introduction of the mixing water to the cement and aggregates, or the introduction of the cement to the aggregates." Any thoguhts on...
  3. DHKpeWI

    Drawing Details in Revit

    I am looking to learn how to use Revit Structure to draw details. I have been watching videos on Youtube, but many of them assume some knowledge of Revit. Do you know of good videos on line that explain the basics of using Revit particularly for drawing details? Thanks
  4. DHKpeWI

    Post Tensioned Shop Drawings

    I did a back check of the bending moments and shears for the beams and found that the moments in the PT designer's calcs are much smaller. I used a simple program to find the moment for multi-span beam and my numbers are significantly higher. The PT engineer thought that the pt caused the...
  5. DHKpeWI

    Post Tensioned Shop Drawings

    I am reviewing post-tensioned concrete slab and beam shop drawings and calculations. It is my first time. What advice do you have on things to look for?
  6. DHKpeWI

    Cold Form Steel Program: Moment & Shear

    This is for users of the CFS program by RGS Software for cold formed steel member design. In the member check menu, the user is required to input the axial loads, moments and shears. Must the maximum shear and moment be used even if they do not occur at the same location? Thanks.
  7. DHKpeWI

    PDC Technical Report 10-02

    PicoStruc: The copy you uploaded ended at page 78. Is that the entire document?
  8. DHKpeWI

    PDC Technical Report 10-02

    PicoStruc: The file is not accessable from that web site.
  9. DHKpeWI

    PDC Technical Report 10-02

    I need the PDC Technical Report 10-02. It is my understanding that they updated it in April of this year, but now it is no accessable from the PDC web site. Can anyone post a copy or email it to me?
  10. DHKpeWI

    Saw Cuts in Slab on Grade

    How soon after pouring should saw cuts be made in a slab on grade? The slab is 4" thick and is being poured in Florida. Thanks
  11. DHKpeWI

    Fastening Light Gauge to 5/16" Steel

    Thanks everyone for your help!
  12. DHKpeWI

    Fastening Light Gauge to 5/16" Steel

    I spoke with the Hilti engineer, and he sindicated that the self tapping screws would work when drilled from above. He recommended using 14 gauge or 12 gauge material.
  13. DHKpeWI

    Fastening Light Gauge to 5/16" Steel

    I need to determine what screws should be used to connect a 5/16” plate to light gauge rafters and roof trusses. See the attached sketch. The wind uplift is around 80 pounds/foot. The 5/16” bent plate will support a gutter, which will weigh 16 pounds/foot if full of water. The building is in...