thanks to all responses. I'm just asking if someone have any references to such demand. I'v been informed, not officially by a friend that the authorities require a 20 meter distance between the earthing (or cathodic grounding) of the high voltage pylon and the UST, because of safety and not...
Hi, couldn't find any references to minimal distance between under ground propane tank to pillar of high voltage. The pillar is grounded in case of a bridge of cables, and this creates a risk to close UST. Please advice, or give reference relevant. Is the electric distribution company has some...
Thanks Duwe6. I appreciate your response. The need for cryogenic design on piping is quite interesting and logical.
The reason of not using EFV was raised by engineers claiming that it blocks their need for higher capacities (I found that it exceeds 3 meter/s) and the need for frequently...
thnks Duwe6 for your response. can you comment on 2 issues -
1- which standard is mandatory in USA for the design of LPG storage farms? API2510 or NFPA 58?
2- in reference to the liquid oulets of the tank (not the track loading station)- is it accepted not to use internal safety valves or...
Hi, I would ask any help on interpretation of the right applicable standard for design demands. There are a group of spherical tanks each in the size of 1500 Ton LPG. This is a farm of containers that located inside the refinery premises, and used to store the final product before delivery to...
Hi, I would ask any help on interpretation of the right applicable standard for design demands. There are a group of spherical tanks each in the size of 1500 Ton LPG. This is a farm of containers that located inside the refinery and used to store the final product before delivery to road tracks...