That is right, thank you, i will apply restraints,
But my question is how to install multiple clevis hangers on the same rack with restraints; is it possible ?
if we install multiple of them, then what kind of restraints will be installed to the pipe rack ?
Dear all,
I have a pipe rack to be installed and pipe hangers are selected as Clevis hanger types;
There are several pipes to be installed and i need to know to install these Clevis hangers on the same pipe rack with seismic criteria.
How can i design the pipe rack with these type of hangers...
I will need advice to find sources for HVAC installation site works management as preperation of work schedules, organizing site teams, material arrangment, reporting, documentation for installation + testing + commissioning; method of statement for HVAC works.
I am trying to find usefull...
We have an installed ventilation system and the system remained without working after testing and commisioning period.
Previously, system was cleaned by working the fans.
The client is ready for start-up of the system and we need advise for cleaning of the ducts from dust etc.
How we can...
It ?s not for general conditioning, the specified room will be a calibration room of pneumatic products, trying to check some standards covering this design fundamentals will help, i think but i trying to find the right standard, do u have any idea please?
Does anyone can help me for precision air conditioning?
Our client asked a maximum temperature difference +/- 1 degrees celcius and RH %50 (+/- 10) for a sensitive or precision calibration room.
How we can get data for precision air conditioning desing with its classification.
We have an UPS Room with 80kvA. How much air change can be taken for this room of what shall i do foor exhaust to cover the heat gain of this room?
We are not allowed to put split unit?