I work for the Wisconsin DOT, and just this summer was part of the construction oversight of a multi-lane concrete roundabout. Much of what we did was already mentioned: 10' truck apron, 2% pitch to the mountable curb & gutter on the outside of the apron, verticle curb on the inside. This was...